LX-300+/1170
PG adjust lever
CR guide grounding plate
Parallelism adjust bushing
Left frame
Base frame
Figure4-15. Carriage Unit Removal
5.
Rotate the right and left parallelism adjust bushing and remove them from respective
frame.
6.
Release the PG adjust lever hook, connecting to the left frame.
Disassembly and Assembly
CR guide shaft
Carriage unit
Parallelism adjust bushing
Oil pad
Right frame
Disassembly and Assembly
Figure4-16. Hook at the PG Adjust Lever
7.
Remove the carriage unit along with the CR guide shaft and PG adjust lever from the
printer mechanism.
A D J U S T M E N T
When the carriage unit is replaced, perform Bi-D adjustment.
R E Q U I R E D
Revision C
PG Adjust Lever -- Hook
83