Kaco Powador 2002 Operating Instructions Manual page 33

Hide thumbs Also See for Powador 2002:
Table of Contents

Advertisement

S e ctio n 5 ·
Insta l lati on an d S ta rt-Up
5.
Clamp the enclosed cable bridge in the upper GFDI
terminal and the DC+ (fi gures 5.13 + 5.14) or DC-
connection (fi gures 5.15 + 5.16). Consult the module
manufacturer for information on which generator pole
should be earthed.
6.
Activate earthing monitoring using the display. See
section 5.7 for more information on this procedure.
GN/YE
PV-
PV-
DC-
GFDI
2
1
PV-
PV-
DC-
GFDI
3
BU
BK
Figure 5.13: Positive earthing on the
Powador 2002-3002
PE
PV-
PV-
DC- GFDI DC+ PV+
2
1
PE
PV-
PV-
DC-
3
GN/YE
BU
Figure 5.14: Positive earthing on the Powador
4202-6002 (via PE terminal)
Page 20
DC+
PV+
PV+
1
2
DC+
PV+
PV+
3
RD
GN/YE
GN/YE
PV+
1
2
GFDI
DC+
PV+
PV+
3
BK
RD
GN/YE
PV-
PV-
DC-
GFDI
2
1
PV-
PV-
DC-
GFDI
3
BU
BK
Figure 5.15: Negative earthing on the
Powador 2002-3002
PE
PV-
PV-
DC- GFDI DC+ PV+
2
1
PE
PV-
PV-
DC-
3
GN/YE
BU
Figure 5.16: Negative earthing on the
Powador 4202-6002 (via PE terminal)
I M PO RT A NT
The fuse is triggered in the event of a ground fault in the
PV system. The inverter interrupts the grid-feed until the
fuse has been replaced. Only use identical fuses of the
same type (Littlefuse KLKD1, 600 V, 1 A, fast-acting).
Installation Instructions Powador 2002 / 3002 / 4202 / 5002 / 6002_EN
DC+
PV+
PV+
1
2
DC+
PV+
PV+
3
RD
GN/YE
GN/YE
PV+
1
2
GFDI
DC+
PV+
PV+
3
BK
RD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powador 5002Powador 6002Powador 3002Powador 4202

Table of Contents