Installing The Operating System; Powering Off The System - Silicon Graphics 2400 Owner's Manual

Table of Contents

Advertisement

Chapter 5: System Configuration and Operation

Installing the Operating System

Powering Off the System

76
The basic IRIX operating system is factory installed on your system disk. No software
installation is required. If additional software is desired, it must be downloaded either
locally (using a CD-ROM drive) or remotely over the network. See the IRIX Admin: Disks
and Filesystems manual for additional information about mounting and configuring
drives. Refer to the IRIX Admin: Software Installation and Licensing manual for the detailed
steps required to download the software.
A copy of the IRIX operating system is supplied with the system on a compact
Note:
disc. Place the CD in a secure place in case you need to reinstall the operating system.
The system should be powered off only for routine maintenance or repair. You can power
your rack system off in a number of ways.
Bring the system down from a shell.
Become superuser by typing
Enter your superuser password, if prompted.
When you see the superuser prompt (#), type
A message similar to the following appears on the screen:
Okay to power off the system now.
Press any key to restart.
Use the (MMSC) display to shutdown the rack (see Chapter 7, "Using the System
Controller").
Turn off the power switches for the system and the peripherals in the following order:
printer (if installed)
terminals
system modules
rack PDU
and pressing Enter.
/bin/su
/etc/shutdown
and press Enter.

Advertisement

Table of Contents
loading

This manual is also suitable for:

2800

Table of Contents