Specifications; Plumbing; Electrical; Standards And Approvals - Mira Elevate Installation And User Manual

Electric shower
Table of Contents

Advertisement

1. Plumbing

1.1.
Minimum maintained inlet pressure:
9.5 kw = 70 kPa (0.7 bar)
0.8 kw = 00 kPa ( bar)
1.2.
Maximum static inlet pressure of 000 kPa (0 bar).
1.3.
Minimum static inlet pressure of 50 kPa (0.5 bar) to keep the inlet valve
closed.

2. electrical

2.1.
the Mira Elevate 9.5 kw requires a 40 amp circuit protection device.
the Mira Elevate 0.8 kw requires a 45 amp circuit protection device.
2.2.
The terminal block will accept cable sizes up to 16 mm

3. standards and approvals

3.1.
the Mira Elevate complies with all relevant directives for cE marking.

InsTaLLaTIon ReQUIReMenTs

Plumbing
.
when installed in very hard water areas (above 00 ppm temporary hardness)
your installer may advise the installation of a water treatment device, to reduce
the effects of limescale formation. Your local water company will be able to
advise the hardness of water in your area.
2.
It is recommended that a non-restrictive (free flowing) isolating valve is fitted
as part of the cold water supply pipe to allow the complete maintenance of the
appliance. Do not use a valve with a loose washer plate (jumper) as this can
lead to the build up of static pressure.
3.
The appliance is only suitable for installation within the shower area. It is fitted
with a pressure relief device and must be positioned over a water catchment
area with the controls at a convenient height for all users.

sPeCIFICaTIons

7
.


Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents