Safety : Warnings; Warning; Caution - Mira Elevate Installation And User Manual

Electric shower
Table of Contents

Advertisement

1.Warning!

1.1. this shower can deliver scalding temperatures if not operated, installed or
maintained in accordance with the instructions, warnings and cautions contained
in this guide and on or inside the appliance.
1.2. THIs aPPLIanCe MUsT Be eaRTHeD. MaKe sURe sUPPLeMenTaRy
BonDIng CoMPLIes WITH THe "ReQUIReMenTs FoR eLeCTRICaL
InsTaLLaTIons".
The installation must be in accordance with the current edition of BS 7671 "The
IEE Wiring Regulations" in force at the time of installation. This appliance is
intended to be permanently connected to the fixed electrical wiring of the mains
system with its own dedicated supply.
1.3. Do noT twist the individual cable cores of the live and neutral conductors, as
this will prevent them from entering the terminal block.
1.4. the shower unit must noT be fitted where it may be exposed to freezing
conditions. Make sure that any pipework that could become frozen is properly
insulated.
1.5. Do noT fit any form of outlet flow control as the outlet acts as a vent for the
tank body. Only Mira recommended outlet fittings should be used.
1.6. if the cover is removed, the following warnings must be observed:
1.6.1.
turn off the electrical and water supplies before removing the cover.
1.6.2.
Mains connections are exposed when cover is removed.
1.6.3.
refer to the wiring diagram before making any electrical
connections (see section "Wiring Diagram").
1.6.4.
Ensure all electrical connections are tight, to prevent them
overheating.

2. Caution!

2.1. Follow all warnings, cautions and instructions contained in this guide, and on
or inside the appliance.
2.2. The electrical installation must comply with the "Requirements for Electrical
Installations", commonly referred to as BS 7671 the "IEE Wiring Regulations".
Or any particular regulations and practices, specified by the local electricity
supply company in force at the time of the installation. the installation should be
carried out by an electrician or contractor who is "Part P" (Building Regulations)
registered, or is a member of an association such as:
2.2.1.
National Inspection Council for Electrical Installation and
Contracting (NICEIC), throughout the UK.
2.2.2.
the Electrical contractors association (Eca), England and wales.
2.2.3.
the Electrical contractors association of scotland (Ecas).

saFeTy : WaRnIngs

4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents