Installation Checklist
Checklist
Table 3-1
Installation Checklist
Task
Cisco uBR 3x10 RF Switch and all accessories unpacked
Types and numbers of interfaces verified
Brackets installed
Cisco uBR 3x10 RF Switch mounted in rack (optional)
Cisco uBR 3x10 RF Switch chassis grounding lug installed and grounding wire
connected
Optional cable management bracket installed on the Cisco uBR10012 CMTS
AC power cable or DC power leads connected to power source and
Cisco uBR 3x10 RF Switch; cables secured
Captive installation screws on Ethernet controller, power supply, and upstream and
downstream switch cards checked
Network interface cables and devices connected
ASCII terminal attached to console port
Console port set for 9600 baud, 8 data bits, no parity, and 1 stop bit (9600 8N1)
System power turned on (DC OK LED is on)
System boot complete (I/O controller enabled LED is on)
Ethernet controller, power supply and upstream and downstream switch cards
operational
System ready for global and interface-specific configuration
Notes:
Cisco uBR-3x10 RF Switch Hardware Installation and Cabling Guide
3-2
Chapter 3
Installing the Cisco RF Switch
Verified by
Date
OL-1984-06

Advertisement

Table of Contents
loading

Table of Contents