Installation - Empire Comfort Systems DVP36DP31N-2 Installation Instructions And Owner's Manual

Direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVP36DP31N-2:
Table of Contents

Advertisement

Framing and Finishing
1. Choose unit location.
2. Frame in fireplace with a header across the top. It is important
to allow for finished face when setting the depth of the frame.
3. Attach fireplace to frame using adjustable nailing flange. Preset
depth to suit facing material (adjustable to 3/8", 1/2" or 3/4" depths).
NOTICE: Fireplace must mount flush to facing material. If facing
material requires more depth than 3/4" mark and drill two (2)
1/8" holes into fireplace side at appropriate depth. Bend standoff
tabs as needed to move fireplace flush with facing material. See
Figures 9A and 9B.
4. Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of drywall strip to determine final depth.
Page 12

INSTALLATION

Figure 9A
Figure 9B
vent pipe Clearance
NOTICE: Maintain one inch (1") of clearance around vertical vent
pipe. See Figures 10A and 10B. For horizontal vent, maintain a
minimum 1" clearance to the bottom and sides of the vent, and 3"
clearance to combustibles above the vent pipe. See Figure 10A.
Top of Vent
(76 mm)
3"
(25 mm)
1"
Figure 10A
1" MINIMUM CLEARANCE AROUND VENT PIPE
Figure 10B
Combustibles NOT
allowed in shaded
area
4" Diameter flue
7" Diameter
intake vent
1"
(25 mm)
VENT PIPE
26927-8-0611

Advertisement

Table of Contents
loading

Table of Contents