LevelOne GSW-1676 User Manual page 32

16-port gigabit w/ 4-port sfp web smart switch
Hide thumbs Also See for GSW-1676:
Table of Contents

Advertisement

I
NSTALLING THE
• Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the
rack-environment temperature is within the specified operating
temperature range (see page C-2).
• Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly
is not overloaded.
• Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.
3-4
S
WITCH

Advertisement

Table of Contents
loading

Table of Contents