Preparing the Connections
Connections overview
CAI
PRV
BD
BWS
Fig. 4
Use an approved pipe sealant or teflon tape when connecting the following
installation fittings.
VC
CAI
NPT
NPT
NPT
GC
BWR
BF
Boiler Connections
This section is an overview only!
Refer to subsequent sections for
detailed information on individual
piping connections.
Piping connections for Vitodens
100-W, WB1B 26 and 35
(factory supplied)
Legend
BWR
Boiler water return, ¾"
BWS
Boiler water supply, ¾"
BD
Boiler drain
BF
Boiler fill
GC
Gas connection, ¾" NPTM
(male thread)
PRV
Pressure relief valve
NPT
National Pipe Thread
VC
Vent connection
CAI
Combustion air inlet
connection (optional)
13