Installing Hardware Options; Setting Up A Tower Server - HP ProLiant ML350 User Manual

G6
Hide thumbs Also See for ProLiant ML350:
Table of Contents

Advertisement

Rack-mounting hardware
In addition to the supplied items, you may need:
T-15 Torx screwdriver
Hardware options
Operating system or application software
PDU

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page 37)."

Setting up a tower server

Follow the steps in this section to set up a tower model server. If you are going to install the server into a rack,
refer to the rack installation
Install the feet.
1.
Return the server to an upright position.
2.
Connect peripheral devices to the server
3.
WARNING:
telephone or telecommunications connectors into RJ-45 connectors.
Connect the power cord to the rear of the server.
4.
Connect the power cord to the AC power source.
5.
("Installing the server into the
("Rear panel
To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
rack" on page 35) section.
components" on page 9).
Setup 34