iV. Venting (continued)
Male end of terminal will fit into the
female end of any of the approved
stainless vent systems.
Apply a heavy bead of silicone to the
male end of the terminal before inserting
it into the last piece of pipe. Orient the
terminal so that the seam in the terminal
is at 12:00.
Smooth the silicone over the seam
between the terminal and the last piece
of pipe, applying additional silicone if
necessary to ensure a tight seal.
Allow the silicone to cure per the
silicone manufacturer's instructions
before operating the boiler.
Table 8a: U.S. Boiler Vent System Components
(Stainless Steel)
Vent System
ALP080 - 210
Component
3" Vent
SS Vent Kit
102501-01
Horizontal Vent
Terminal
8116310
(Included in Kit)
PVC to SS Vent
Adapter
102219-01
(Included In Kit)
Vertical Vent Terminal
102680-01
Pipe x 1 Ft.
8116296U
Pipe x 3 Ft.
8116298U
Pipe x 5 Ft.
8116300U
Pipe x Adjustable
8116319U
90° Elbow
8116294U
45° Elbow
8116292U
Horizontal Drain Tee
8116302U
Vertical Drain Tee
8116304U
Single Wall Thimble
8116116
Table 8B: alternate Vent Systems and Vent Components (Stainless Steel)
Vent
Manufacturer
System
Protech
Systems
FasNseal
Inc..
SVE
Z-Flex
Series III
("Z-Vent III")
Flex-L Intl.
Star-34
NOTE: See vent system manufacturer's literature for other part numbers that are required such as straight pipe, elbows, firestops
and vent supports.
0
Part Numbers
Equivalent
ALP285 - 500
Feet of Pipe
4" Vent
102501-02
8116313
N/A
102220-01
102680-02
N/A
100176-01
100177-01
100178-01
Equal to
Installed
100179-01
Length
(1.06 to 1.64)
5.5 (3")
100180-01
8.0 (4")
4.0 (3")
100181-01
4.5 (4")
100182-01
100183-01
100184-01
N/A
Size
Wall Thimbles
3
FSWT3
4
FSWT4
3
2SVSWTEF03
4
2SVSWTEF04
3
SR03WT15
4
SR04WT15
ii. Combustion Air Termination
b. Optional Two-Pipe Snorkel Termination
Refer to Figure 10.
This installation will allow a maximum of
seven (7) feet vertical exterior run of the vent/
combustion air piping to be installed on the
approved AL29C Stainless Steel horizontal
venting application.
i.
1
3
5
ii. Combustion Air Termination
2
Horizontal Termination
Tee: FSTT3
Tee: FSTT4
Tee: 2SVSTTF03
Tee: 2SVSTTF04
Tee: SRTT-03
Tee: SRTT-04
Horizontal intake terminal is a tee in the
upright position. Tee should protrude
the same distance from the wall as the
exhaust terminal. See Figure 8.
Install a rodent screen (not supplied) in
the inlet terminal. Use a screen having
1/2"
(2 x 2) or larger mesh.
Vent Termination
After penetrating wall, install the
appropriate manufacturer's 90° elbow so
that the elbow leg is in the up direction.
Install maximum vertical run of seven
(7) feet of appropriate manufacturer's
vent pipe. See Figure 10.
At top of vent pipe length install another
appropriate manufacturer's 90° elbow
so that the elbow leg is opposite the
building's exterior surface.
Install horizontal vent terminal.
Brace exterior piping if required.
After penetrating wall, install a 90°
elbow so that the elbow leg is in the up
direction.
Install maximum vertical run of seven
(7) feet of combustion air pipe. See
Figure 10.
At top of vent pipe length install another
90° elbow os that the elbow leg is
opposite the building's exterior surface.
Vertical
Termination
FSBS3
FSBS4
24SVSTPF03
24SVSTPF04
SRTP-03
SRTP-04