ii. Pre-installation & Boiler Mounting (continued)
n. Place Access Panel Gasket adhesive side
(protective paper) down onto Access Panel
underside and align gasket edges flush with panel
edges. Peel off protective paper from one end
of the gasket to expose adhesive, then place the
gasket onto the panel aligning gasket and panel
side, top and bottom edges, and press the gasket
lightly down. Continue peeling of protective
paper and positioning the gasket in place while
insuring edge alignment. Once the gasket is
fully in place and edges are aligned, press the
gasket firmly in position.
o. Set the panel with gasket aside.
16
WALL MOUNTING BRACKET
CENTER LINE
10.0" MIN. CLEARANCE TO COMBUSTIBLES
BOTTOM SECURING
BRACKET CENTER LINE
Figure 2C: Wall Mounting Hole Location / Layout
p. See Section IV Venting; paragraph "Field
Installation of CPVC Vent Pipe - Wall Mounted
Boiler Builds" for instructions on attaching the
vent system to the boiler.
q. After the boiler has been piped, wired, connected
to vent and combustion air system piping and
combustion performance testing completed per
Section XI "System Start-up", install Access
Panel/Gasket assembly and secure with provided
four #8 x ½" black oxide Phillips head sheet
metal screws (located in coin envelope inside zip
lock plastic bag). See Figure 2E "access Panel
and Gasket Installation".
1.0" MIN. CLEARANCE TO COMBUSTIBLE
TOP EDGE OF BOILER
2.0" MIN. CLEARANCE TO COMBUSTIBLE
16
'HOLE B'
3
" DIA. PILOT HOLES
16
5
FOR
" LAG SCREWS
16
(4 PLACES)
'HOLE C'
'HOLE A'
3
25
4
'HOLE D'

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp080Alp105Alp150Alp210Alp285Alp399 ... Show all

Table of Contents