iV. Venting (continued)
Figure 8 : Direct Vent - Sidewall Terminations
use is optional for non-combustible wall.
Insert thimble from wall from outside.
Secure outside flange to wall with nails
or screws, and seal ID, OD and vent
holes with sealant material. Install inside
flange to inside wall, secure with nails or
screws, and seal with sealant material.
• For noncombustible wall application
when thimble is not used, size opening
such that a minimal clearance is
obtained.
See Figure 7.
• Install Rodent Screen and Vent Terminal
(supplied with boiler), see Figure 9 for
appropriate configuration.
• Apply sealant between vent pipe and
opening/thimble to provide weather-tight
seal. Sealant should not restrain the
expansion of the vent pipe.
26
Figure 9: Rodent Screen installation
ii. Combustion Air Piping
• Do not exceed maximum combustion air
length. Refer to Table 7.
• Size combustion air wall penetration to
allow easy insertion of combustion air
piping.
• Install Rodent Screen and Combustion
Air Terminal (supplied with boiler), see
Figure 9 for appropriate configuration.
• Apply sealant between vent pipe and
opening to provide weather-tight seal.
b. Optional Two-Pipe Snorkel Termination
Refer to Figures 7, 9 and 10.
This installation will allow a maximum of
seven (7) feet vertical exterior run of the vent/
combustion air piping to be installed on the
CPVC/PVC horizontal venting application.
nOTiCE
Exterior run to be included in equivalent vent/
combustion air lengths.
i.
Vent Piping
• After penetrating wall, install a Schedule
40 PVC 90° elbow so that the elbow leg
is in the up direction.
• Install maximum vertical run of seven (7)
feet of Schedule 40 PVC vent pipe. See
Figure 10.
• At top of vent pipe length install another
PVC 90° elbow so that elbow leg is
opposite the building's exterior surface.
• Install Rodent Screen and Vent Terminal
(supplied with boiler), see Figure 9 for
appropriate configuration.
• Brace exterior piping if required.
ii. Combustion Air Piping
• After penetrating wall, install a Schedule
40 PVC 90
the up direction.
o
elbow so that elbow leg is in

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp080Alp105Alp150Alp210Alp285Alp399 ... Show all

Table of Contents