Installing The Wireless Control Pad System - Nuvo NV-WCPS Installation And User Manual

Wireless control pad system
Table of Contents

Advertisement

II. Installing the Wireless Control Pad
The Wireless Control Pad is easily integrated into I8G, E6G or Renovia audio system.
Within minutes complete wireless control of the NuVo System is literally in the palm of
your hand.
The Coordinator Installation (Fig. 3)
The Coordinator is designed to communicate with up to five Wireless Control Pads. A
single CAT5 connection from the Coordinator to a "Device" input on the Grand Concerto
EZ Port or Essentia E6G Allport enables communication. If all "Device" inputs are used
on the EZ Port or Allport, the Coordinator can be plugged into an available RJ45 port on
the back. When the Coordinator is plugged into NuVoNet, the blue power LED will light
(provided the NuVo amplifier is plugged into an AC outlet and its power button is
engaged). Note that an external power supply should not be used with the Coordinator.
The CAT5 cable can be extended up to 150 feet in length to allow for optimal placement
of the Coordinator in the home.
Figure 3 – The Coordinator Installation
POWER
SETUP
VARIABLE
OUTPUT
OUTPUT POWER
20W/6OHM X2
RING=R
FIXED
OUTPUT
ZONE 7&8
SUM1
SYS ON
SUM2
EXT. MUTE
SYSTEM
9
RS-232
TIP=L
PROGRAM
USE CNLY WITH 250V FUSE
MODEL NV-I8DM
CONNECT TO
CONNECT TO
SIX SOURCE EIGHT ZONE
AUDIO DISTRIBUTION SYSTEM
NV-I8EZP1
NV-I8X
120V
60Hz 500W
FUSE:T5 A
USE NV-NC1
USE NV-SLC1
NuVo Technologies Cincinnati Ohio USA
www.nuvotechnologies.com
CABLE
CABLE
CONFORMS TO
R
UL STD.6500
US
CERTIFIED TO
C
NETWORK
DIGITAL LINK
CAN/CSA STD.E60065
3033118

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents