Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The Power LED will light on all the time.
All LEDs except PWR LED will flash momentarily and then turn off.
The SYS LED flashes every second continuously, which means the initialization is
finished.