Power On; Initialization - TP-Link T2600G-28TS Installation Manual

Jetstream gigabit l2 managed switch
Hide thumbs Also See for T2600G-28TS:
Table of Contents

Advertisement

4.5 Power On

Plug the female connector of the provided power cord into the power socket of the
device, and the male connector into a power outlet as the following figure shows.
Note: The figure is to illustrate the application and principle. The power cord you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.

4.6 Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond in the following order:
The PWR LED indicator lights on all the time. The SYS LED and the LED indicators of
all the ports keep off.
After about one minute, the SYS LED and LED indicators of all the ports will flash
momentarily and then turn off.
Several seconds later, the SYS LED indicator will flash, which represents a successful
initialization.
100 -24
0V~ 50/6
0Hz 0.5A
Figure 4-6 Connecting to Power Supply
Gigabit L2 Managed Switch
17
Connection