Installation Tools; Product Installation - TP-Link TL-ER5120 Installation Manual

Gigabit load balance broadband router
Table of Contents

Advertisement

Gigabit Load Balance Broadband Router
112

Installation Tools

112

Product Installation

05
Installation
protection measures should be taken.
Ensure the rack and device are well earthed.
Make sure the power socket has a good contact with the ground.
Keep a reasonable cabling system and avoid induced lightning.
Use the signal SPD (Surge Protective Device1 when wiring outdoor.
Note: For detailed lightning protection measures, please refer to Chapter 3
Lightning Protection.
Installation Site
When installing the device on a rack or a flat workbench, please note the following
items:
The rack or workbench is flat and stable, and sturdy enough to support the weight of
5.5kg at least.
The rack or workbench has a good ventilation system. The equipment room is well
ventilated.
The rack is well grounded. Keep the power socket less than 1.5 meters away from the
device.
Phillips screwdriver
ESD-preventive wrist wrap
Cables
Note: These tools are not provided with our product. If needed, please self purchase
them.
Desktop Installation
To install the device on the desktop, please follow the steps:
1.
Set the device on a flat surface strong enough to support the entire weight of the
device with all fittings.
2.
Remove the adhesive backing papers from the rubber feet.
3.
Turnover the device and attach the supplied rubber feet to the recessed areas on
the bottom at each corner of the device.