Westerbeke BCD 4.4KW Operator's Manual page 71

Marine diesel generator sets
Hide thumbs Also See for BCD 4.4KW:
Table of Contents

Advertisement

Servicing After Every 800 Hours of Operation
*1. Remove and check fuel injectors.
Injector spray pressure:
2275 psi
+
140 psi
(160 kgJcm
2
+
10 kg/cm
2 )
Eliminate undesirable injection conditions including
after dripping.
*2. Check the engine's compression pressure.
Remove each glow plug and check each cylinder's
compression pressure.
The engine's cranking
speed is at 280 rpm.
Standard
Minimum
455 psi
(32 kgJcm
2 )
369.7 psi
(26 kgJcm
2 )
(Maximum difference between cylinders: 35.5 psi (2.5 kgJcm
2 )
*3. Check the DC Charging Circuit for proper operation.
*4. Check the tightness of bolts, nuts, and clamps.
Servicing After Every 1000 Hours of Operation
1. Remove, clean, and pressure test the primary heat exchanger. (A local automotive radiator shop should
be able to clean and test the heat exchanger.)
NOTE: Operating in silty and/or tropical waters may require that a heat exchanger cleaning
be performed more often than every 1000 hours.
*2. Check the injection pump's timing.
Westerbeke Generators
68

Advertisement

Table of Contents
loading

Table of Contents