To install an SFP transceiver, insert the transceiver into the SFP port. Press firmly on the
flange of the module to seat it securely into the connector. You can install up to three more
Gigabit Ethernet modules using this procedure.
Figure 12. Installing and SFP transceiver module

Step 6: Apply AC Power

The GS752TP, GS728TP, and GS728TPP Gigabit Smart Switch does not have an On/Off
switch. Power is controlled by the power cord connection.
Before connecting the power cord, select an AC outlet that is not controlled by a wall switch,
which can turn off power to the switch. After selecting an appropriate outlet, use the following
procedure to apply AC power:
1.
Connect the end of the power connection cable to the power receptacle on the back of
the switch.
2.
Connect the AC power connection cable into a power source such as a wall socket or
power strip.
When you apply power, the Power LED on the switch's front panel lights.
If the Power LED does not light, check that the power cable is plugged in correctly and that
the power source is good. If this does not resolve the problem, refer to
Troubleshooting.

Step 7: Apply RPS DC Power

This step is applicable to the GS728TPP only. Plug in the external RPS power supply to the
RPS connector on the back panel.
GS752TP, GS728TP, and GS728TPP Gigabit Smart Switch
25
Appendix A,

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prosafe gs752tpProsafe gs728tpp

Table of Contents