Step 7: Check The Installation; Step 8: Apply Ac Power And Check The Leds - NETGEAR AV Series Hardware Installation Manual

Fully managed switches
Hide thumbs Also See for AV Series:
Table of Contents

Advertisement

Note: Instead of using an RJ-45 Ethernet port, you can connect an SFP or SFP+ port
with an SFP or SFP+ transceiver module and cable to your network. For more
information, see Optional Step 5: Install SFP or SFP+ transceiver modules on page
37.
2. Connect devices to the RJ-45 Ethernet ports on the switch.
3. Verify that all cables are installed correctly.

Step 7: Check the installation

Before you apply power to the switch, perform the steps that are described in this
section.
To check the installation:
1. Inspect the equipment thoroughly.
2. Verify again that all cables are installed correctly.
3. Check cable routing to make sure that cables are not damaged or creating a safety
hazard.
4. Make sure that all equipment is mounted properly and securely.

Step 8: Apply AC power and check the LEDs

The switch provides an On/Off power switch that controls the power.
Before connecting the power cord, select an AC outlet that is not controlled by a wall
switch, which can turn off power to the switch.
To apply AC power:
1. Connect the end of the power cord to the AC power receptacle on the back of the
switch.
2. Plug the AC power cord into a power source such as a wall socket or power strip.
3. Turn the On/Off power switch in the On position.
4. Check to see that the LEDs light correctly.
Installation
AV Line of Fully Managed Switches M4250 Series
39
Hardware Installation Guide

Advertisement

Table of Contents
loading

Table of Contents