Removal And Installation Of Major Components; Fuser Unit - Epson EPL-6200 Service Manual

A4 monochrome page printer
Hide thumbs Also See for EPL-6200:
Table of Contents

Advertisement

EPSON EPL-6200/EPL-6200L
4.5 Removal and Installation of Major
Components

4.5.1 Fuser Unit

The Fuser Unit remains at hazardous temperature for a certain
period of time even after stop of operation and turning off of the
power. To prevent suffering a burn, be sure to wait after power
turning off until the temperature of the Fuser Unit cools down to a
safe level, and then start working on the printer.
1.
Remove the Left Cover. (p.138)
2.
Remove the Right Cover. (p.139)
3.
Remove the Top Cover. (p.142)
4.
Remove the Paper Exit Cover. (p.143)
5.
Disconnect the three connectors. (See Figure 4-33)
6.
Remove the right and left screws (two screws) securing the Fuser Unit.
7.
Remove the Fuser Unit by drawing it out toward the rear side.
When installing the Fuser Unit, lead the harness as shown in Figure
4-30, and take care not to catch the harness between the Fuser Unit
and the printer body.
Disassembly and Assembly

Removal and Installation of Major Components

Figure 4-33. Fuser Unit Removal
Figure 4-34. Installing the Fuser Unit
Revision A
152

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epl-6200l

Table of Contents