Ventilation Operation - Daikin BRC1E61 Operation Manual

Wired remote controller
Hide thumbs Also See for BRC1E61:
Table of Contents

Advertisement

Basic Operation Method

Ventilation Operation

Preparation
For mechanical protection purposes, turn ON the system at least six hours before starting the
operation of the system.
Do not turn OFF the system in season in order to ensure the smooth starting of the system.
Operation Method
1
Vent
Set temperature
20
Return
Setting
2
3
4
5
20
When Air Conditioner Interlocked with Total Heat Exchanger
Set the Operation mode selector button
to Ventilation in the case of operating
the total heat exchanger without the
°C
system between seasons.
To change the ventilation mode setting, make
necessary settings from the main menu
*
Ventilation mode: Automatic, Heat exchange, and Bypass
To change the ventilation rate, make necessary
settings from the main menu
*
Ventilation rate: Low or High
Press On/Off button.
The Operation lamp (green) will be lit
and the system will start operating.
The Operation lamp will be turned OFF
and the system will stop operating when
On/Off button is pressed again.
(Use of Direct Buttons)
(see page 33)
(see page 32)
.
.
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brc1e51a7

Table of Contents