Thermador P24GE Installation Instructions Manual page 8

Thermador professional cooktops
Table of Contents

Advertisement

Available languages

Available languages

FIG. 5 Side View of Cooktop
26-3/8"
3" TO CENTERLINE GAS
INLET
22-5/8"
23-3/8"
2"
Cabinet face for installation with projecting control panel
Cabinet face for installation with flush control panel
* Low Back required when there is less than
12" horizontal clearance from back of cooktop
to combustible material. With more than 12" of
clearance, the Island Trim may be used.
FIG. 8 Installation of 48" Cooktop above two
side-by-side Thermador Warming Drawers,
Model No. WD24
Minimum 3/4" (19 mm)
(22, 9 cm) 9"
2-3/4" (7 cm) Vertical Distance
Between Cutouts
(See Side View for Wood Support)
Step 2: Cabinet Preparation
FIG. 6 Projecting from
12"
1/2"
Side Flange
7-3/4"
4-1/2"
3/4"
Front projects outward 1-3/8" as
shown from standard 24"-deep
base.
0" to 2"
(0 - 51mm)
See Fig. 4
and Table
Di m ensi o n C
1-7/8" (4,8 cm)
Horizontal Distance Between Cutouts
Cabinet Front
5/8" Notch
Depth
1-3/8"
Side View
Plywood support
Install additional
wood support along
front edge of cutout
6
FIG. 7 Flush to Cabinet
Front
* Provide clearance for screws by
increasing cutout height by 1/16"
or by notching in the location of
the three screws.
2" Notch
Depth
Front flush with cabinets;
minimum of 25-3/8" cabinet
depth required.
7
/
"
-13
16
(19,8 cm)
2 3/4" (70 mm) minimum
between cutouts

Advertisement

Table of Contents
loading

Table of Contents