User Maintenance Instructions - Central Pneumatic Earthquake 65159 Set Up And Operating Instructions Manual

1/4”, 1/2”, 3/8” air ratchet wrench
Table of Contents

Advertisement

uSER-mAINTENANCE
INSTRuCTIONS
Procedures not specifically
explained in this manual
must be performed only by a
qualified technician.
FROm ACCIdENTAl
OpERATION: detach the air
supply, safely discharge any
residual air pressure in tool,
and release throttle and/or
turn switch to off position
before performing any
inspection, maintenance, or
cleaning procedures.
TO pREVENT SERIOuS
INjuRY FROm TOOl
FAIluRE: do not use
damaged equipment. If
abnormal noise, vibration,
or leaking air occurs, have
problem corrected before
further use.
Cleaning, maintenance, and
lubrication
Note: These procedures are in addition to
the regular checks and maintenance
explained as part of the regular op-
eration of the air-operated tool.
daily - Air Supply maintenance:
1.
Every day, perform maintenance on
the air supply according to the com-
ponent manufacturers' instructions.
The lubricator's oil level needs to be
maintained and the moisture filter
must be regularly drained. Perform-
ing routine maintenance on the air
supply will allow the tool to operate
SKU 65159 60 61 For technical questions, please call 1-800-444-3353.
TO pREVENT
SERIOuS INjuRY
more safely and will also reduce wear
on the tool.
2.
Quarterly (every 3 months) - Tool
disassembly, Cleaning, and In-
spection: Have the internal mecha-
nism cleaned, inspected, and lubri-
cated by a qualified technician. If the
vanes need replacement, all vanes
should be replaced as a set.
Page 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Earthquake 65160Earthquake 65161

Table of Contents