3 Server Board Installations and Upgrades
Before You Begin
Before working with your server product, pay close attention to the installation precautions at the
end of this manual.
Tools and Supplies Needed
•
Phillips (cross head) screwdriver (#1 bit and #2 bit)
•
Needle nosed pliers
•
Antistatic wrist strap and conductive foam pad
Installing and Removing Memory
The silkscreen on the board for the DIMMs displays DIMM A1, DIMM A2, DIMM B1, and DIMM B2,
starting from the inside of the board.
NOTE
Memory sizing and configuration is guaranteed only for qualified DIMMs approved by MAXDATA.
Installing DIMMs
To install DIMMs, follow these steps:
1. Observe the safety and ESD precautions at the beginning of this book.
2. Turn off all peripheral devices connected to the server. Turn off the server.
3 . Disconnect the AC power cord.
4. Remove the server's cover. See your chassis documentation for instructions.
5. Locate the DIMM sockets. See Figure 5.
MAXDATA Server PLATINUM 500 I M6
C
D
A
Figure 5. Installing Memory
DIMM A2
DIMM A1
B
DIMM B1
DIMM B2
13