Monogram ZBD6920D00SS Installation Instructions Manual page 16

Built-in dishwashers
Table of Contents

Advertisement

STEP 24
INSTALL TOEKICK
• Locate toekick and screws set aside in step 5.
Toekick
Attachment
Figure LL
Screws
• Replacethe toekick and make sure it is against the floor.
• Insert and tighten the 2 toekick attachment screws.The
toekick should stay in contact with the floor to ensure quiet
dishwasher operation.
STEP 25
LITERATURE
• Be sure to leave complete literature package, Installation
Instructions and product samples with the consumer.
NOTE: While performing installations described in this book,
safety glasses or goggles should be worn.
For Honogrom _ Iocol service in your oreo, coil
1.800.444.1845.
NOTE: Product improvement is a continuing endeavor at
General Electric. Therefore, materials, appearance and
specifications are subject to change without notice.
GE AppliGnces
& Lighting
Appliances
General Electric Company
Louisville, KY/40225
GEApplionces.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents