Step 9, Prepare The Duct Covers; Step 10, Install Upper Duct Cover - GE Monogram ZV925 Installation Instructions Manual

36" island chimney vent hood
Hide thumbs Also See for Monogram ZV925:
Table of Contents

Advertisement

Installation
Instructions
INSTALLATION-VENTED T OTHEOUTSIDE
ISTEP 91 PREPARE THE DUCT COVERS
• Remove the plastic protective covering on all
duct pieces.
• Install ] cage nuts on each inside section of
the top duct cover. The cage nuts fit into the
rectangular
slots, clips facing outward.
• Install ] cage nuts on each side of the lower
duct covers.
f
Rectangular
/_
slots
t
' Nut
\\
J
\
i
Plan
I
diagram
i
Top
sections
Top
sections
Support
frame
ISTEP 101 INSTALL UPPER DUCT COVER
• Place the tall duct covers onto the top of the
hood. This section has venting holes on one end.
NOTE: If gou are installing this hood for
recirculating
operation, place the duct covers
onto the hood with the venting slots at the top.
If the hood is vented to the outside, the holes
should be positioned on the bottom.
• Secure the sides with 6 screws installed through
the cage nuts.
%
%
• Raise the assembled duct covers to the top,
against the ceiling.
• Hatch mounting
holes, one on each side. Install
screws through the duct and into the support.
16

Advertisement

Table of Contents
loading

Table of Contents