Installation Preparation
Duct tape
Pencil and tape measure
TOOLS AND MATERIALS REQUIRED
,/_
(NOT SUPPLIED)
3/8" swivel
socket or pivoting
_
_
hex socket with 6"
W_r
r_
°ns
•
ippe
Key hole saw
Spirit level
Step ladder
Safety glasses
Wire nuts
Saber saw
or sawsall
Carpenter's
square
Pliers
Metal snips
Electric or battery-operated drill
and 3/16" bits, Phillips and flat
blade screwdriver bits.
8" round metal
duct, length to
suit installation•
Phillips and flat blade
screwdrivers
Strain relief for
junction cover•
120V60Hz. 15 or 20 Amp,
2-wire with ground• properly
grounded branch circuit•
REMOVE THE PACKAGING
CAUTION:
LIFTTHE HOOD OUT OF THE BOX
BY THE CENTER METAL PORTION. DO NOT LIFTBY THE
GLASS SIDES.
PRUDENCE :
LEVEZ LA HOTTE#,
L'EXTERIEUR DE LA BO/TE PAR LA PORTION METAL
CENTRAL. NE LEVEZ PAS PAR LES COTES DE VERRE.
CAUTION:
Weor glovesto protect ogoinst
shorp edges.
PRUDENCE :
Portezdes gants pour @viter
lesblessures cous@es por lestronchonts.
ooo_oo
• Grosp the hood bg the metol insert in the center
and lift straight
up and out of the box,
• Remove and properlg discard the plastic wrapping.
• Remove parts box, duct covers and other
packaging.
Need help?
Do you have a question about the Monogram ZV925 and is the answer not in the manual?