GE Monogram ZV925 Installation Instructions Manual

GE Monogram ZV925 Installation Instructions Manual

36" island chimney vent hood
Hide thumbs Also See for Monogram ZV925:

Advertisement

Quick Links

I
I
$
36" Island Chimneg Vent Hood
ZV925
49-80329 I
05-06 JR
Monogram:

Advertisement

Table of Contents
loading

Summary of Contents for GE Monogram ZV925

  • Page 1 36" Island Chimneg Vent Hood ZV925 Monogram: 49-80329 I 05-06 JR...
  • Page 2 49-80406 Printed in Italy 04-06 JR "11 ---I...
  • Page 3 Installation Instructions BEFORE YOU BEGIN WARNING:To REDUCETHE RISKOF FIRE,ELECTRICAL S HOCKOR Read these instructions completelg INJURY,OBSERVE THE FOLLOWING: carefullg. A. Usethis unit onlg in the manner intended bg the • IM PORTANT- save these instructions for local manufacturer. If gou have onUquestions, contact the manufacturer.
  • Page 4: Table Of Contents

    Design Information CONTENTS Design Information Step 10, Install Upper Duct Cover ..........Product Dimensions ................Step 11, Install Lower Duct Cover ..........Step !2, Install Duct Cover Trim ............ Advance Planning Step 13, Install Metal Filter .............. Advance Planning .................. Step 1£...
  • Page 5: Advance Planning

    Advance Planning ADVANCE PLANNING POWER SUPPLY Ductwork Planning IMPORTANT- (Please read carefully) • These vent hoods are equipped for 8" round WARNING: ductwork. • Determine the exact location of the vent hood. FOR PERSONAL SAFETY,THIS APPLIANCE • Plan the route for venting exhaust to the outdoors. MUST BE PROPERLYGROUNDED.
  • Page 6: Duct Fittings

    44 ft. *Actual length of straight duct plus duct fitting equivalent. Equivalent length of duct pieces are Total Duct Run. based on actual tests conducted bg GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood.
  • Page 7: Installation Preparation

    Installation Preparation Possible Hood Mounting DETERMINE INSTALLATION HEIGHT Trim Piece Installation Frame Ceiling Needed Height Height (inches) Height (inches) • Decorative duct covers are provided to conceal 7'11" the ductwork running to the ceiling. 30 1/2 30 1/2 • This hood can be installed for recirculating 8'1"...
  • Page 8: Tools And Materials Required

    Installation Preparation TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED) 3/8" swivel socket or pivoting hex socket with 6" °ns Electric or battery-operated drill Duct tape • ippe and 3/16" bits, Phillips and flat Key hole saw blade screwdriver bits. Pencil and tape measure 8"...
  • Page 9: Parts Provided

    Installation Preparation PARTS PROVIDED Locate the parts packed with the hood. 1 charcoal filter for Stainless steel filter recirculating installation Air deflector for recirculating installation HARDWAREPACKAGE Locate and check contents. Screws Duct cover trim pieces 6m Co e ui_i1_ngg shown actual size. 2 each of 4sizes screws 12 sheet...
  • Page 10: Construct Ceiling Support

    Installation Preparation CONSTRUCT CEILING SUPPORT Plan the Location of the Hood and Ductwork • The hood should extend begond the front and rear • Use a plumb bob to check the location. The edge of the cooking appliance. countertop/cooktop below the hood must be •...
  • Page 11 Installation Preparation CONSTRUCT CEILING SUPPORT CONTINUED EXAMPLE B 10-1/16" install cross-framing 16" joist -- symmetrically over spacing ÷ duct/cooktop --" centerline 2x4 cross \framing 7- ..7-1/16"- Align duct Cooktop to center of outline cooktop Top view - ceiling joists run perpendicular to front of hood EXAMPLE C 10-1/16"...
  • Page 12 Installation Preparation CONSTRUCT CEILING SUPPORT CONTINUED 2x4 min. • Secure each 2 x/4 block with at least four (4), #10 cross framing wood screws, 3" long (not supplied). Use 8 wood screws total for the two supports. • The cross framing must be accuratelg aligned to assure correct...
  • Page 13: Step I, Mount Template

    Installation Instructions INSTALLATION-VENTED T OTHEOUTSIDE [STEP 1] MOUNT TEMPLATE • Align the template with the marks on the ceiling and tape in place. - Be sure the template is oriented correctlg with the front of the hood. • Use a plumb bob to be sure the mounting holes will provide parallel alignment with the countertop...
  • Page 14: Step 3, Cut Duct To Length For Vented Installation

    Installation Instructions INSTALLATION-VENTED T OTHEOUTSIDE ISTEP51INSTALL HOODATTACHMENT ISTEP 3] CUT DUCT TO LENGTH FOR VENTED INSTALLATION SCREWS • Meosure from House house duct to exhoust opening. • Cut the 8" duct length to size. Duct Install 4 • Slip duct over the length attachment _ exhoust opening.
  • Page 15: Step 6, Mount The Hood Onto The Support

    Installation Instructions INSTALLATION-VENTEDTO THE OUTSIDE [STEP 7] CONNECT CABLES ISTEP 6] MOUNT THE HOOD ONTO THE SUPPORT etaine WARN ING: Two p eople required to lift and position the hood onto the support. AVERTISSEMENT :,Ifaut deu× personnes pour lever et mettre en clip ._ place a hotte sur le support de montage.
  • Page 16: Step 8, Connect Electrical

    Installation Instructions INSTALLATION-VENTED T OTHEOUTSIDE ISTEP 8] CONNECT ELECTRICAL • Remove junction box cover and knockout on the Verifg that power is turned off at the source. left side. WARN ING: ,f house wiring is not 2-wire Knockout with a ground wire, a ground must be provided the installer.
  • Page 17: Step 9, Prepare The Duct Covers

    Installation Instructions INSTALLATION-VENTED T OTHEOUTSIDE ISTEP 91 PREPARE THE DUCT COVERS ISTEP 101 INSTALL UPPER DUCT COVER • Remove the plastic protective covering on all • Place the tall duct covers onto the top of the duct pieces. hood. This section has venting holes on one end. •...
  • Page 18: Step 11, Install Lower Duct Cover

    Installation Instructions INSTALLATION-VENTED T OTHEOUTSIDE ISTEP 111 I NSTALL LOWER DUCT COVER [STEP 12] INSTALL DUCT COVER TRIM Front bottom duct cover section Upper trim (snap into place and secure with Side Upper- 6 screws - 3 )er side) strip bracket trim strip...
  • Page 19: Installation Instructions--Recirculating

    Installation Instructions INSTALLATION-RECIRCULATING [STEP 1] MOUNT TEMPLATE • Align the template with the marks on the ceiling and tape in place. - Be sure the template is oriented correctlg with the front of the hood. • Use a plumb bob to be sure the mounting holes will provide parallel alignment with the countertop...
  • Page 20: For Recirculating Operation

    Installation Instructions INSTALLATION-RECIRCULATING ISTEP 31 INSTALL AIR DEFLECTOR, ISTEP 41 INSTALL UPPER SUPPORT FRAME CUT DUCT FOR RECIRCULATING • Raise the upper support OPERATION toward the ceiling. • Thread the house wiring • Temporarilg, slide the through one of the large air deflector into the holes, preferablg on the support frame.
  • Page 21: Step 5, Install Lower Structure To Upper Structure

    Installation Instructions INSTALLATION-RECIRCULATING ISTEP 5] ISTEP61INSTALL BLOWER/MOTOR INSTALL LOWER STRUCTURE TO UPPER STRUCTURE • Raise the blower/motor ° • Slide lower frame into piece toward the o°-- assembled frame. the upper frame. Hatch the marked alignment • Carefullg raise the motor holes.
  • Page 22: Step 7, Install Hood Attachment Screws

    Installation Instructions INSTALLATION-RECIRCULATING [STEP 9] CONNECT CABLES ISTEP 7] INSTALL HOOD ATTACHMENT SCREWS Retaine clip ,_ To lights • Install 4 hood attachment screws in the bottom To control ---- panel of the support as shown. Leave 1/4" gap between screw head and support flange.
  • Page 23: Step !0, Connect Electrical

    Installation Instructions INSTALLATION-RECIRCULATING ISTEP I0] CONNECT ELECTRICAL • Remove junction box cover and knockout on the Verifg that power is turned off at the source. left side. WARN ING: ,f house wiring is not 2-wire Knockout with a ground wire, a ground must be provided the installer.
  • Page 24: Step !!, Prepare The Duct Covers

    Installation Instructions INSTALLATION-RECIRCULATING ISTEP 111 PREPARE THE DUCT COVERS ISTEP 121 INSTALL UPPER DUCT COVER • Remove the plastic protective covering on all duct • Place the tall duct covers onto the top of the pieces. hood. This section has venting holes on one end. •...
  • Page 25: Step 13, Install Lower Duct Cover

    Installation Instructions INSTALLATION-RECIRCULATING ISTEP 131 INSTALL LOWER DUCT COVER [STEP 14] INSTALL DUCT COVER TRIM Front bottom duct cover section Upper trim (snap into place and secure with 6 screws - 3 )er side) strip bracket trim strip _°°_ Plan diagram Low e r top view trim...
  • Page 26: Step 15, Install Filters

    Installation Instructions INSTALLATION-RECIRCULATING ISTEP ISI INSTALL FILTERS [STEP 161 FINALIZE INSTALLATION IMPORTANT: Check to be sure that the main • Remove all tape and packing material. ON/OFF switch next to the motor is in the ON • Referto the Owner's Manual for operating instructions. position.
  • Page 27 Notes...
  • Page 28 Notes...
  • Page 29 ® local service in your area, call 1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. Monogram: GEConsumer&hldustrial GEAppliances GeneralElectricCompany Louisville, K Y40225 ge com Printed in Italg @2006 GECompany...

Table of Contents