Step I, Mount Template; Step 2, Adjust Frame Height - GE Monogram ZV925 Installation Instructions Manual

36" island chimney vent hood
Hide thumbs Also See for Monogram ZV925:
Table of Contents

Advertisement

Installation
Instructions
INSTALLATION-VENTED T OTHEOUTSIDE
[STEP 1] MOUNT TEMPLATE
• Align the template
with the marks on the ceiling
and tape in place.
- Be sure the template
is oriented correctlg
with the front of the hood.
• Use a plumb bob to be sure the mounting
holes
will provide parallel alignment
with the countertop
below.
• Center punch all hole locations.
• Drill pilot holes in the/4 screw locations. Use a 3/16"
bit and drill approximatelg
1-1/2" deep.
• Drive/4 hex head wood screws into the center of
the ceiling joists and cross framing.
Leave a 1/4"
gap to allow the screw head to engage the keghole
slots on the support frames.
• Cut the 8-1/2" duct opening through the sheet rock.
ISTEP 2_ ADJUST FRAME HEIGHT
• Measure exact ceiling height.
• Find the exact frame height
required on the chart on page 6.
• Remove 2 screws on each of the
/4sides of the frame to loosen the
upper structure,
lower structure
and blower/motor.
• Adjust the height "X", according to
the chart on page 6. Use a total of
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.
,, height
2-3/4 ' _;__.
24" min.
30" max,
Ceiling
height
_'
"
-q9
X
-
,,e
12