GE Monogram ZV1050 Installation Instructions Manual page 7

42" island vent hood
Hide thumbs Also See for Monogram ZV1050:
Table of Contents

Advertisement

Installation
Instructions
[STEP 1 ] CONSTRUCT CEILING SUPPORT
Plan the location
Determine
the exact location
of the vent hood.
• Use a plumb
bob to check
location
to be sure
countertop/cooktop
location
below
the hood
will
align
exactly.
• The hood
should
project
forward
1-1/2"
beyond
the front
edge
of the cooking
appliance.
See illustration.
• Observe
the recommended
space
(30")
between
the
cooking
surface
and
bottom
of hood.
Ceiling
Hood
Centerline
Front
31-1/2" i..................................................................
Approx.1-1/2''_ *i i
Beyond Cooking I
f_
Cooktop
Surface
,
-
I Countertop
SideView
Ceiling support
structure
• At the hood location,
install 2 x 4 cross flaming
between ceiling joists as shown. (2x4s are required
to support
the weight of the hood.)
• Arrange
cross flaming
in the ceiling to suit the
existing structure.
• Your ceiling joists will be like one of the following
examples.
EXAMPLE A
1
16"Joist
Spacing
I
11-1/4"Install Cross-Framing
Symmetrically About
Duct/CooktopCenterline
I
iii
iiii_iii
',iii
i
i
i
__
i
i
i
i
--
4----
i
i
i
--
i
i
2x4 Cross
I
Framing
I
i
i
Align Ductto Center
of Cooktop
Front
of Hood
TopView--Ceiling Joists Parallelto Frontof Hood
't
Cooktop
Outline

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Monogram ZV1050 and is the answer not in the manual?

Table of Contents