Installation
Instructions
ISTEP
4 ] MOUNT
TEMPLATE
• Align the template
with tile marks on tile ceiling and
rope in place.
- Be sure tile template
is oriented
correctly, with tile
flont of tile hood.
• Use a phnnb bob to be sure the mounting
holes will
provide parallel alignment
with tile countertop
below.
• Center punch all hole locations.
• Drill pilot holes in tile 4 screw locations.
Use a 5/32"
bit and drill approximately
1-1/2" deep.
• Gut tile 8-1/4" duct opening
and approx.
1" wire
access hole.
,_ss H oles
ISTEP51
INSTALL SUPPORT FRAME
Upper z
Support
Frame
Lower
Support
Frame
Support
Frame
Opening
_CheckLevel in
Both Directions
Install upper support
frame
• Secure tile upper support
flame to tile ceiling joists
and cross flaming
with tile 4 lag screws provided.
For
maxinlum
rigidity and strength,
tile screws must be
driven into tile center of the joists and/or
cross
flaming.
Check to be sure the support
frame is level, vertically
and horizontally.
_o°dnt in g
_Lower
Support
Flang _
e _
I
_1 ......
.....................
'
40"
30"Recommended
76"
Countertop
Install lower support
frame
• Insert lower support
flame
(or accessory support
flame, ZX1059SFSS or ZX10510SFSS)
into the upper
support
flame and loosely secure with 8 screws and
washers (4 on the flont and 4 on tile back sides).
• Adjust tile lower support
flame up or down to tile
desired height above tile countertop.
Tighten screws.
IMPORTANT:
Again, check to be sure tile support
is level in both directions.
There is no way to level
tile hood after tile hood is secured
to tile flame.
11