Step 4, Mount - GE Monogram ZV1050 Installation Instructions Manual

42" island vent hood
Hide thumbs Also See for Monogram ZV1050:
Table of Contents

Advertisement

Installation
Instructions
ISTEP
4 ] MOUNT
TEMPLATE
• Align the template
with tile marks on tile ceiling and
rope in place.
- Be sure tile template
is oriented
correctly, with tile
flont of tile hood.
• Use a phnnb bob to be sure the mounting
holes will
provide parallel alignment
with tile countertop
below.
• Center punch all hole locations.
• Drill pilot holes in tile 4 screw locations.
Use a 5/32"
bit and drill approximately
1-1/2" deep.
• Gut tile 8-1/4" duct opening
and approx.
1" wire
access hole.
,_ss H oles
ISTEP51
INSTALL SUPPORT FRAME
Upper z
Support
Frame
Lower
Support
Frame
Support
Frame
Opening
_CheckLevel in
Both Directions
Install upper support
frame
• Secure tile upper support
flame to tile ceiling joists
and cross flaming
with tile 4 lag screws provided.
For
maxinlum
rigidity and strength,
tile screws must be
driven into tile center of the joists and/or
cross
flaming.
Check to be sure the support
frame is level, vertically
and horizontally.
_o°dnt in g
_Lower
Support
Flang _
e _
I
_1 ......
.....................
'
40"
30"Recommended
76"
Countertop
Install lower support
frame
• Insert lower support
flame
(or accessory support
flame, ZX1059SFSS or ZX10510SFSS)
into the upper
support
flame and loosely secure with 8 screws and
washers (4 on the flont and 4 on tile back sides).
• Adjust tile lower support
flame up or down to tile
desired height above tile countertop.
Tighten screws.
IMPORTANT:
Again, check to be sure tile support
is level in both directions.
There is no way to level
tile hood after tile hood is secured
to tile flame.
11

Advertisement

Table of Contents
loading

Table of Contents