Download Print this page

GE Monogram ZV750 Installation Instructions Manual page 7

36" vent hood
Hide thumbs Also See for Monogram ZV750:

Advertisement

Installation
36" Vent Hood
Check
Installation
Hardware
Ductwork,
Wiring,
Hood
Attachment
Locations
I,ocate tim hardware
accessory box packed
with range hood and check contents.
10
Wall
Fasteners
2 Mounting
Brackets
iFT
Ph,,,, ead
Screws
Utility Bars with Screws
3 Filters
_-x
2 Large
FlatWashers
lO
Wood
Screws
Decorative
Duct
Wall Mount Template
To determine
ductwork
locations:
• I,ocate
the template
packed
with the
literature.
• Determine
tim exact installation
location.
- Measure
36" flom
tim floor
to tim top
of the cooking
surface.
Add 25-1/2"
recommended
space
flom
the cooking
surface
to bottom
of hood.
Mark
that
location.
- Use a level to draw a straight
pencil
line
on tim wall.
- Tape tim template
in position
along
the
penciled
line. CHECK
TO BE SURE
TEMPI,ATE
IS I,EVEI,.
• Measure
flom
the peak of the hood
to the ceiling
as indicated.
The
dimension
should
be:
-
26-1/4"
to 38-1/4"
for 8 ft. to 9 ft. ceilings.
-
38-1/4"
to 50-1/4"
for 9 ft. to 10 ft.
ceilings
(This installation
requires
ZX10SY accesso_ T duct
covet,)
CEILING DUCTING
If ductwork will vent straight tap to tim ceiling:
• Use a level to draw a line straight tap, flom
,/FOB
CEILING
3 1/2"
Wall',./VENT_
DUCTING
Centerline To
/r"
6-1/2"Die.Hole_
,,
\\\\\
i
X J.
.Centerline
2{,_
6' Min. Above
FOB WALL VENTDUCT [
Bracket L ocation
i
i
i
WALL DUCTING
If ductwork
will vent to the rear:
Use tim level to draw a line suaight
tap flom
the centerline
on the template.
Measure
at least 6" above
tim bracket
location
shown
on tim template
to tim centerline
of
the 6-1/2"
dia. duct hole.
(Hole
may need
to
be elongated
for duct
elbow.)
the centerline
on the template
to the ceiling.
HOUSE WIRING LOCATION:
• Measure 3-1/2" fiom the back wall to the
centerline
of a 6-1/2"
dia. hole on the
ceiling.
Note: If drywallis not present, a dddrywallthickness to the
3-1/2" dimension.
The junction
box is located
on the top of the
hood,
at tim flont
right
side.
Rotate house
wiring
as close to tim installation
location
as possible,
through
the ceiling,
soffit
or back wall. Wiring
should
enter
at least 4"
above
tim bracket
on tim right
side.
7

Advertisement

loading