Installation
Preparation
ZEU30R
DIGITAL COOKTOPS
WITH 30" VENT
1-3/4" Min. Cool<topCutout to Rear
Vertical Combustible Surface
29-7/8" (SS)
22-1/4"
Cutout
Depth
t
Front Edge
of Countertop
28-1/2"
Cool<top Area Cutout
5/8" Cool<topOverlap
_ (1-1/8" at Center)
i
E
I
2-1/2" Min.
_
Clearanceto Cutout
2" Min. Cutout
to Side Walls
23-1/2" (SS)
23-3/8" (B,W)
Total Flat
Surface
Required
at Center
2-1/2" to
Cutout
_22" to Support Rail_
I
24-3/4"
Thick
Support
Rail
Countertop
Cutout:
Requires 23-3/8" (B,W) 23-1/2" (SS) flat
countertop surface. Requires 24-3/4" (B,W) and 24-7/8" (SS) total
countertop depth.
Cabinet:
Requires 23" inside cabinet
depth. See Creative Solutions, install in
an island or move cabinet base forward.
ZEU36R
DIGITAL COOKTOPS
WITH 36" VENT
1-3/4" Min. Cool<topCutout to Rear
Vertical Combustible Surface
36-1/8" (SS)
36" (B,W)
. jN/4"
Overlap
1`
"
,,2-3/4
Gap
21-3/4
_
23"
Cutout |
34"
(SS)
Depth 19-1/8"
Cooktop and Vent Cutout
22-7/8" (B,W)
Cooktop{
Total Flat
Cutout
5/8" Cool<topOverlap
Surface
(1-1/8" at Center)
Required
I'
2-1/2" Min.
, _--__
Front Edge
Clearance to Cutout
2 Min. Cuto t
of Countertop
to Side Walls
Countertop
Cutout:
Requires 22-7/8" (B,W) 23"
(SS) flat countertop surface. Requires 24-1/4" (B,W)
and 24-3/8" (SS) total countertop depth.
2-1/2" to
Cutout
1-7/8"
_22" to Support Rail_
24-3/4"
3/4"
Thick
Support
Rail
Cabinet:
Requires 22-1/2" inside cabinet depth.
Remove rear support rail.
Need help?
Do you have a question about the Monogram ZVB36 and is the answer not in the manual?
Questions and answers