Installation
Instructions
INSTALLATION
- VENTED TO THE OUTSIDE
I-I-IDUCTWORK,
WIRING LOCATIONS
Determine the exact location of the vent hood.
• Locote the templote
pocked with the literoture.
- IVleosure 36" from the floor to the top of the cook-
ing surfoce. Add hood instollution height deter-
mined on previous poges. IVlork thor Iocotion.
- Use u level to draw u straight pencil line on the wall.
- Tope the templote in position olong the penciled
line. CHECK TO BE SURETHE TEIVlPLATE IS LEVEL.
6 5/8"
holefor duct
Centerline 8 1/4" min.
J
above hoodchassis xx_
,_i_,_ _"
/
.......................... i,
Cabinet/Ceiling
ducting:
If ductwork
will vent stroight
up to the ceiling or
cobinet:
• Use u level to drow o line struight up, from the cen-
terline on the templote to the ceiling/cubinet.
• IVleusure 6-5/8" from the bock woll to the centerline
of on 8-1/2" hole on the ceiling/cobinet
top.
NOTE: If drywoll is not present, odd drywoll thickness
to the 6-5/8" dimension.
Wall Ducting:
If ductwork
will vent to the reor:
• Use o level to drowo
line stroight up from the
centerline on the templote.
• IVleosure ot leost 8 1/4" obove the hood chossis
top surfoce Iocotion shown on the templote to the
centerline of o 8-1/2"-dio. duct hole. (Hole moy be
elongoted for duct elbow.)
House Wiring
Locution:
• The junction
box is Iocoted on the top right side of
the hood.
10
I-I-IDUCTWORK,
WIRING LOCATIONS
(Continued)
•Wiring con enter the cobinet from the ceiling or
bock woll.
• Route odditionol wiring length to reoch the junction box.
I L IWALL
OR CEILING
AND CABINET
PREPARATION
IMPORTANT
--The
vent hood must be secured
to the cobinet ond ot leost two woll studs ond
drywoll with onchors. Cobinet must be copoble of
supporting
100 Ibs.
• With the templote
toped in ploce, use o punch to
mork oil mounting
screw Iocotions. Mork duc-
twork, screw ond electricol
holes occording
to
your opplicotion.
• Drill o minimum
3/4" hole for electricol coble in
the bottom of the cobinet.
• Drill 1/8" pilot holes ot the 4 punched Iocotions on
the bottom of the cobinet.
• Drill 1/8" pilot holes ot the 4 punched Iocotions on
the woll
• Remove the templote.
• Enlorge holes thot did not enter studs to 5/16".
Top onchors for woll fosteners into the holes.
Cobinet templote
Cobinet mounting
screw locutions
holes which oli(,n with the studs.
Need help?
Do you have a question about the Monogram ZV30H and is the answer not in the manual?