Steps For Finalizing The Installation - Lopi GreenField GS2 Owner's Manual

Direct vent freestanding stove
Hide thumbs Also See for GreenField GS2:
Table of Contents

Advertisement

Installation

Steps for Finalizing the Installation

1.
Remove the glass (see page 27).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Make sure the accent light works correctly.
NOTE: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4.
Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included in
the owner's pack) into control panel light assembly (see the illustration below). Velcro is provided to secure the
9v battery.
Swing the control
cover down to
access the batteries.
5.
Install the logs (see page 29).
6.
Replace the glass.
7.
Start the heater.
8.
Leak test all gas joints.
© Travis Industries
(for qualified installers only)
Battery Holder for
Control Panel Lights
4121130
25
AA
Battery
Holder
AA Battery Tray
100-01316

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenfield green smart 2

Table of Contents