Packing List; Additional Items Required; Installation Overview; Installation Hints - Lopi GreenField GS2 Owner's Manual

Direct vent freestanding stove
Hide thumbs Also See for GreenField GS2:
Table of Contents

Advertisement

8

Packing List

Propane Conversion Kit
Log Set
Touch-Up Paint
½" FPT to 3/8" Flare Fitting
Rear Vent Cover

Installation Overview

See "Vent
Requirements"
See "Gas Line
Installation"

Installation Hints

Recommended Optional Equipment Installation Order:
-- GreenSmart Remote
-- Blower
-- LP Conversion and other optional equipment
Install the logs last - they are fragile.
When determining the location of the stove, locate the wall studs (for horizontal penetrations) and
ceiling trusses (for vertical penetrations). You may wish to adjust the stove position slightly to ensure
the vent does not intersect with a framing member.
Fumes and smoke from the paint curing and oil burning off the steel may occur the first time you start
this heater. This is normal. We recommend you open windows to vent the room.
© Travis Industries
Installation
See "Floor
Protection
Requirements"
(for qualified installers only)

Additional Items Required

Vent (see "Venting Requirements" for details)
Gas Line Equipment (shutoff valve, pipe, etc.)
4121130
See
"Clearances"
100-01316

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenfield green smart 2

Table of Contents