8
Packing List
•
Propane Conversion Kit
•
Log Set
•
Touch-Up Paint
•
½" FPT to 3/8" Flare Fitting
•
Rear Vent Cover
Installation Overview
See "Vent
Requirements"
See "Gas Line
Installation"
Installation Hints
•
Recommended Optional Equipment Installation Order:
-- GreenSmart Remote
-- Blower
-- LP Conversion and other optional equipment
•
Install the logs last - they are fragile.
•
When determining the location of the stove, locate the wall studs (for horizontal penetrations) and
ceiling trusses (for vertical penetrations). You may wish to adjust the stove position slightly to ensure
the vent does not intersect with a framing member.
•
Fumes and smoke from the paint curing and oil burning off the steel may occur the first time you start
this heater. This is normal. We recommend you open windows to vent the room.
© Travis Industries
Installation
See "Floor
Protection
Requirements"
(for qualified installers only)
Additional Items Required
•
Vent (see "Venting Requirements" for details)
•
Gas Line Equipment (shutoff valve, pipe, etc.)
4121130
See
"Clearances"
100-01316