Completing The Installation; Testing The Cooler; Clean Up The Site; Show Customer Their New Cooler - Braemar Down Series Owners Manual Installation, Operating & Service Instructions

Evaporative air conditioning
Table of Contents

Advertisement

COMPLETING THE INSTALLATION

Testing The Cooler

Once you are satisfied that the Cooler is installed
and commissioned correctly, it is important to run
the cooler and ensure that everything is working
as it should.
Check that the unit runs quietly and with an even
distribution of air to all outlets.
Make sure there are no water leaks. Where fitted,
initiate a drain of the tank by pressing the
b u t t o n s t o g e t h e r f o r 1 s e c o n d w h e n t h e
controller is OFF. The signal "dr" will display to
confirm the drain has activated.

Clean Up The Site

Clean up and tidy the premises, removing or
recycling all rubbish. Your aim should be to
have the customer not even aware that you
have been there, apart from having their
new Braemar installed to enjoy.

Show Customer Their New Cooler

This is a good time to explain the features and principles of
Evaporative Ducted Cooling to the new owner. Explain the
wall control operation, how to exhaust the premises, and
how to best run their cooler.
Please take a few moments to explain to the customer:
• How far windows need to be opened.
• How to turn the unit On.
• Explain the preparing to start mode.
• How to operate the cooler manually.
• How to operate the cooler in vent mode.
• How to operate the cooler in Auto mode.
• How to drain the cooler (where fitted with drain valve).
• How to turn the power and water off.
• Maintenance requirements.
Present the customer with their warranty card for their attention.
Present the customer with this manual, and encourage them to keep it for future
reference.
31
and
32
33
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Top seriesSide seriesRpc250Rpc320Rpc400Rpc450

Table of Contents