Bleed System; Water Manager (Optional) - Braemar Down Series Owners Manual Installation, Operating & Service Instructions

Evaporative air conditioning
Table of Contents

Advertisement

INSTALLATION

Bleed System

The bleed control tap is located
externally on a corner pillar.
Adjustment to the bleed rate is
made by turning the black/red
tap control to the desired setting.
Check the bleed rate by running
into a graduated container for a
set time, say 10 minutes.
Recommended Bleed Rates
Model
lp10 min
RPC250
1.2
RPC320
1.6
RPC400
2.0
RPC450
2.0
Water Management System (optional)
An optional Water Manager Kit, Part #
073392, can be supplied with the cooler or
a t a l a t e r d a t e i f r e q u i r e d . T h e w a t e r
m a n a g e r , w h i c h i s f u l l y a u t o m a t i c , i s
c o n t r o l l e d b y t h e C P M D e l e c t r o n i c s
combined with your Braemar wall control.
The system is designed to ensure that the
water is always fresh, maintains your cooler
in good condition and ensures optimum
cooling performance.
When the cooler is off for 72 hours, the
drain valve will open automatically and
empty water from the cooler. When the
cooler is turned on again, fan operation will
delay for a few minutes while the tank refills
and the cooling pads are saturated again.
At any time when the wall control is OFF,
you can drain the cooler by pressing and
holding
and
for 1 second. The display
will show "dr" to confirm the operation has
activated.
Note: For Two Speed Coolers use KIT
098425
6
C
B
A
lph
7
10
12
12
A = Bleed Tap
B = Min/Max Label
C = Corner Pillar
D = Supply Hose from Pump
E = Bleed Hose to Drain
7
D
G
A = Drain Valve
B = Power Lead (plugs into control box)
C = O-Ring
D = Tank
E = Nut
F = Drain Adaptor
G = Lock Nut
7
D
E
A
B
C
E
F
ILL746-B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Top seriesSide seriesRpc250Rpc320Rpc400Rpc450

Table of Contents