This machine presents
serious injury hazards
to untrained users. Read
through this entire manu-
al to become familiar with
the controls and opera-
tions before starting the
machine!
Wear safety glasses dur-
ing the entire setup pro-
cess!
This machine and its com-
ponents are very heavy.
Get lifting help or use
power lifting equipment
such as a forklift to move
heavy items.
Model g0513/g0514 (Mfg. since 8/02+)
SEcTiON 3: SETUp
Needed for Setup
the following are needed to complete the setup
process, but are not included with your machine.
Description
•
safety glasses ........................................... 1
•
Cleaner/degreaser (page 16) .... as needed
•
disposable shop rags ............... as needed
•
Forklift, 1000 lb Capacity .......................... 1
•
Chain or strap w/hook, 1000 lb Capacity . 1
•
additional people ....................................... 1
•
straightedge 3' ........................................... 1
•
dust Collection system .............................. 1
•
dust hose 4" .............................................. 1
•
hose Clamps 4" ......................................... 2
Unpacking
your machine was carefully packaged for safe
transportation. remove the packaging materials
from around your machine and inspect it. if you
discover the machine is damaged, please imme-
diately call Customer Service at (570) 546-9663
for advice.
save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi-
tion of your shipment, inventory the contents.
Qty
-13-