2. Installation
2.2
Internal Battery Connection (Battery Start-up)
60
2.3
Installation in Tower Position
Follow steps 1 to 3 in the illustration below to adjust the tower stands for the upright position.
Always keep 6 inches free space behind the UPS rear panel. The distance between the tower stands should
be 17.7 inches.
86-87050-00 A02 - Page 14
1. Remove the two mounting screws (59) to
2. Push the battery disconnect switch so that
3. Secure the two mounting screws (59).
59
Input Cable L6-30P
6 inches
17.7 inches
free the battery disconnect switch (60).
you can read "Connected".