Image 3-28
3. Turn in the rigging clamps (A) into the rigging points using a 17 mm open ended spanner and secure the rigging clamps by turning
the safety nut (B) on the rigging clamp against the rigging point using a 17 mm open ended spanner.
Warning:
Always use four (4) rigging points, equally spread, to suspend the projector.
Image 3-29
4. Place all four rigging clamps in open position as illustrated.
Image 3-30
5. Place the projector (upside down) under the truss installation and lower the truss until the support bars of the truss are nearby
the rigging clamps mounted on the projector.
R59770180 FLM HD20 11/07/2008
X mm
A
B
3. Physical installation
N
B
29