Operation
WARNING
Pressurized Equipment Hazard
To reduce the risk of an injury, follow the
Pressure Relief Procedure on page 20
whenever you are instructed to relieve the
pressure.
1. Make sure the ES ON/OFF valve is OFF.
2. Turn on the main air supply valve (B).
3. Position the air cap by loosening the air cap retain-
ing ring, and rotating the air cap for a vertical or hor-
izontal spray pattern. Tighten the retaining ring until
the air cap is held firmly in place; you should not be
able to rotate the air cap horns by hand.
Vertical Pattern
Horizontal Pattern
22
4. Fully open the fan air adjustment valve.
5. Fully open the fluid adjustment valve.
I
ES
O
ti1273a
6. Fully open the atomizing air restrictor valve.
7. Make sure the ES ON/OFF valve is OFF.
0
100
%
KV
HI
LO
ES
ES
I
O
ti1269a
100
0
%
KV
HI
LO
ES
ES
I
O
ti1267a
ti1272a
ES
I
O
ti1273a
309293K