Gold's Gym XR66 GGSY69530 User Manual page 17

Weight system
Table of Contents

Advertisement

36. Wrap the Low Cable (63) over a 90mm Pulley
(38). Attach the Pulley and a Cable Trap (37)
between the second set of holes from the bottom
of the two Pulley Plates (36) with an M10 x 48mm
Bolt (23) and an M10 Nylon Locknut (75). Make
sure that the Cable Trap is turned to hold the
Cable in the groove of the Pulley.
37. Wrap the Low Cable (63) under a 90mm Pulley
(78). Attach the Pulley and a Cable Trap (37) to
the Left Base (2) with an M10 x 48mm Bolt (23)
and an M10 Nylon Locknut (75). Make sure that
the Cable Trap is turned to hold the Cable in
place.
38. Wrap the Low Cable (63) over a 90mm Pulley
(38). Attach the Pulley to the bracket (bracket 1)
on the Left Top Frame (11) with an M10 x 45mm
Bolt (78) and an M10 Nylon Locknut (75).
Wrap the Low Cable (63) over another 90mm
Pulley (38). Attach the Pulley to the other bracket
on the Left Top Frame (11) with an M10 x 45mm
Bolt (78) and an M10 Nylon Locknut (75).
39. Thread an M12 Nut (80) onto the Low Cable (63)
as far as it will go. Slide a 50mm Washer (59)
onto the Cable and thread the Cable into the left
Weight Tube (34) until the Cable is tight. Tighten
the Nut against the Washer. Do not overtighten
the Cable into the Weight Tube or the Top
Weight (31) will be lifted off the weight stack.
40. Locate the High Cable (61). Route the small ball
on the Cable (61) through the Right Upright (5)
and under a 90mm Pulley (38). Make sure the
Cable is over the welded bar inside the
Upright. Attach the Pulley inside the Upright with
an M10 x 78mm Bolt (85), two M10 Washers
(74), two 17mm Spacer (58), and an M10 Nylon
Locknut (75).
36
37
38
37
23
38
78
Bracket 1
39
31
40
75
58
74
Large
Ball
5
61
17
36
75
23
37
38
63
75
2
63
11
75
75
38
38
63
63
80
59
34
38
58
74
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xr66Ggsy69530

Table of Contents