Preparations For Initial Start-Up - Westerbeke 12C- TWO Operator's Manual

Marine diesel engines
Hide thumbs Also See for 12C- TWO:
Table of Contents

Advertisement

PREPARATIONS FOR INITIAL START-UP
PRESTART INSPECTION
Before starting your engine for the first time or after a
prolonged layoff, check the following items:
o
Check the engine oilleve!. Add oil
to
maintain the level
at the high mark on the dipstick.
OThman the fuel supply, then check the fuel supply and
examine the fuel filter/water separator bowl for
contaminants.
o
Check the transmission fluid leve!.
o
Check the DC electrical system. Inspect wire connections
and battery cable connections. Make certain the positive
(+)
battery cable is connected to the starter solenoid and
the negative (-) cable is connected to the engine ground
stud (this location is tagged).
o
Check the coolant level in both the plastic recovery tank
and at the manifold.
NOTE:
If
the engine has not yet been filled with coolant,
refer to the COOLING SYSTEM section of this manual.
D
Visually examine the engine. Look for loose or missing
parts, disconnected wires, and unattached hoses. Check
the threaded connections and engine
attachment~.
D
Make certain there is proper ventilation around the
engine.
An
ample supply is necessary for proper engine
perfonnance.
D
Make sure the mounting installation is secure.
,
D
Ensure the propeller shaft is securely attached to the
transmission.
D .
Open the thru-hull and make certain raw water is primed
to the raw'water strainer.
TOP 'OIL FILTER
CHECK ENGINE
OIL LEVEL
LOW
. I .
.
CHECK TRANSMISSION FLUIO.
CHECK COOLANT LEVEL
~
WESTERBEKE
Engines
&
Generators
8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 12C- TWO and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

12d-two

Table of Contents