Chapter 2 Server Installation; Overview; Unpacking The System; Preparing For Setup - Supermicro A+ SERVER 1012C-MRF User Manual

A+ server
Table of Contents

Advertisement

2-1

Overview

This chapter provides a quick setup checklist to get your A+ Server 1012C-MRF
up and running. Following the steps in the order given should enable you to have
the system operational within a minimal amount of time. This quick setup assumes
that your system has come to you with the processor and memory preinstalled. If
your system is not already fully integrated with a serverboard, processor, system
memory etc., please turn to the chapter or section noted in each step for details on
installing specific components.
2-2

Unpacking the System

You should inspect the box the server was shipped in and note if it was damaged
in any way. If the server itself shows damage, you should file a damage claim with
the carrier who delivered it.
2-3

Preparing for Setup

Decide on a suitable location for the rack unit that will hold the server. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fields are generated. You will also need
it placed near a grounded power outlet. Read the Rack and Server Precautions in
the next section.
The A+ Server 1012C-MRF does not ship with a rack rail hardware package as the
system can be rack mounted without the use of rails. An optional rack rail package
is available if you wish to order from Supermicro. Follow the steps in the order given
to complete the installation process in a minimal amount of time. Please read this
section in its entirety before you begin the installation procedure outlined in the
sections that follow.
Chapter 2
Server Installation
2-1
Chapter 2: Server Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A+ SERVER 1012C-MRF and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents