Step 4, Secure Wiring; Step 5, Size And Install Ductwork - GE ZV855 Installation Instructions Manual

Island vent hood
Hide thumbs Also See for ZV855:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLATION -VENTED
TO THE OUTSIDE
SECURE WIRING
• Route house wiring through
the ceiling hole and
pull o length to reach the hood junction
box.
FrontSide
Support-
Frames
?
0
?
U
Ce!ling
\\\
?
0
?
---
:
House
Wiring
• Tape the wire to the front of the frame support to
prevent damage
during installation
and service.
_-1 SIZE AND INSTALL DUCTWORK
• Measure from house duct (Dim. A) to bottom
of
support frame.
- Add at least 1" for duct overlap at the top.
- Subtract 3/4" for hood insertion into the bottom
of the frame.
• Cut the 6" dia. duct to the required length.
House Duct--
Side
View
Support
Frame
Ceiling
/
.=
Dim.A i
Length
DuctConnection
ToHood........ /="[_]
..........................................
3/d_]]_
Bottom Support
Frame Flange
NOTE: The bottom end of the duct must be flared
slightlg, to facilitate
installation
of the hood.
• Install duct up through
support frames onto the
house duct. Push duct up until it is 3/a" from the
bottom
of the support frame flange.
• Secure the duct to house duct connection
with
screws and seal with duct tape.
• Seal duct connection
with duct tape, making sure
connection
is secured in place.
13