Toshiba R410A Service Manual page 211

Super heat recovery multi system
Hide thumbs Also See for R410A:
Table of Contents

Advertisement

Part to be
No.
exchanged
5
Inverter assembly
M Removal of P .C.
board and
electric parts
5. Reactor
6. Transformer
7. Electrolytic
capacitor
Work procedure
REQUIREMENT
Wear protective clothing on your hands
as other components may cause and
injury etc.
1) Stop operation, and then turn the power
supply to the unit.
2) Take off the screws (3 positions) on the
terminal block installation board.
3) Take off the fixing screws on each part
and then remove the cables.
Caution when removing the electrolytic
capacitor (No.7)
1) Electrolytic capacitors will discharge
over time.
As the natural discharge by the electlytic
capacitor may be unavailable and
voltage may remain in some cases due
to trouble conditions, be sure to confirm
discharge of the capacitor.
2) Use a suitable resistive load (100 /40W
or equivalent) to discharge the capacitor
or plug of the soldering iron, make
continuity and discharge between
and
poles.
Recommendation will check the voltage
with a DC volt meter.
NOTE
Do not discharge using a tool (e.g. screw-
driver) as the capacitor charge can cause
an injury.
Reactor, transformer and electrolytic
Reactor, transformer and electrolytic
condenser are stored at the rear side
condenser are stored at the rear side
of the terminal block.
of the terminal block.
5. Reactor
5. Reactor
(2 pieces)
(2 pieces)
3) Screw
3) Screw
211
Remarks
2) Screw
2) Screw
2) Screw
2) Screw
2) Screw
2) Screw
Terminal block
Terminal block
installation board
installation board
3) Screw
3) Screw
6. Transformer
6. Transformer
7. Electrolytic condenser
Plug of soldering iron

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents