Quick Start; Unpacking - Fluke 917X Series Technical Manual

Hart metrology wells
Table of Contents

Advertisement

3 Quick start

3.1 Unpacking

Unpack the instrument carefully and inspect it for any damage that may have occurred
during shipment. If there is shipping damage, notify the carrier immediately.
Verify that the following components are present:
9170
9170 Metrology Well
9170-INSX Insert (X=A, B, C, D, E, or F)
Power Cord
RS-232 Cable
Getting Started Guide
User's Guide
Report of Calibration and calibration label
DIN Connector (-R units only)
Well Insulator
Tongs (insert removal tool)
9930 Interface-it Software and User's Guide
9171
9171 Metrology Well
9171-INSX Insert (X=A, B, C, D, E, or F)
Power Cord
RS-232 Cable
Getting Started Guide
User's Guide
Report of Calibration and calibration label
DIN Connector (-R units only)
Well Insulator
Tongs (insert removal tool)
9930 Interface-it Software and User's Guide
9172
9172 Metrology Well
9172-INSX Insert (X=A, B, C, D, E, or F)
Power Cord
RS-232 Cable
Quick start
Unpacking
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9170917191729173

Table of Contents