Installer Checklist - DCS BGB131 Installation, Use & Care Manual

Professional side burner
Hide thumbs Also See for BGB131:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
INSTALLER CHECKLIST
Specified
clearances
maintained
to combustibles.
Side burner
is properly
mounted.
All internal
packaging
removed.
Burner is seated
properly
and does not rock.
Each burner
lights satisfactorily,
individually
or with
adjacent
burner
lit.
Knob(s) turn freely. Bezel(s) centered.
Flame adjusted.
Pressure regulator
connected
and set for 4.0"W.C. Natural,
11.2"W.C. LP gas.
Manual
shut-off
valve installed
and accessible.
Unit tested
and free of leaks.
User informed
of gas supply
shut-off
valve location.
Battery
installed
in module
properly
and generates
ignition
spark when activated.
PLEASE LEAVE THESE INSTRUCTIONS WITH THE USER.
USER, PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bgb132Bgb131-biBgb132-bi

Table of Contents